Reconstruction
After 5 years, we came to the reconstruction of the skate park, which was built in 2012. A very sensible approach is to put into the budget the reconstruction of the skate park, the warranty period of which is coming to an end. To build a skate park near the sea, with such a tough climate, we experienced how the materials behave, because we had no such experience, and even what we learned about this experience abroad did not reassure us. Skate parks in the US near the ocean are built mostly of concrete. And then the sea is 100 meters from the skate park, and this is a very cruel climate, high humidity
We were pleased to discover the untouched wooden bearing beams and the laminated plywood showed itself to all 100500. The top mesh plywood (the surface for driving) was worn out, it's not surprising that the warranty period for the surface of the ride for the type used there was 3 years, but it was all much better than we expected.
Many thanks to Anton Chernoy, who explained to the city authorities that it is better to produce services for the skate park, in conjunction with those who implemented it. The city authorities wanted to do a reconstruction of the skate park on their own. When we arrived at the site, we saw that the contractors had managed to do it. Uneven chopped load-bearing racks of grind box (which should have been perfectly flat). Having voiced all that we saw to the customer, after making an examination, we managed to convince the customer that nobody will do this work better than us.
Now the project is ready, we have made some changes, we are sure that the skate park will heal with a new life.